Who asks for this
Inventory controllers preparing a cycle-count redesign or a slotting change.
Time on site
One to two days on the floor, depending on aisle count.
Pricing basis
Based on warehouse footprint and number of storage types (floor stack, selective rack, pushback).
If you also need the full visibility board, start with the flagship visit.